DESIGN, FABRICATION AND ONSITE INSTALLATION
We design and manufacture solutions for your business needs.
We design and manufacture solutions for your business needs.
At Firepower Fabrication we understand that businesses requiring our services need cost effective, fast, efficient solutions with the least possible disruption.
Fast response service available in the event of a break in or accident.
With vast experience in engineering, construction and fabrication bothon and off site, we know how and where to make savings. Our long standing good relationships with materials Suppliers and Suppliers in general mean we can pass on savings to our clients.
We design, fabricate and install, making our end to endprocess highly efficient and accurate. We can quickly and efficiently overcome any unforeseen challenges. Alternatively, an installation company working with a separate fabrication company not only adds cost but also massively increases the chances of mistakes and delays.
With our history of working with large businesses up and down the U.K. we know the importance of limiting disruption. Businesses simply cannot stop, this is why we work around our clients. We can work safely within your working environment, protecting our team and yours. We can provide weekend or overnight installations where needed.
We were asked by a client to create a partition between the main factory floor and maintenance workshop area. The steel partition needed to be 3.5m high and span 18m with a personnel door at one end. We designed a very cost effective solution. After our clients approval it was fabricated and installed within 2 weeks. Installation took less than 2 days. This particular factory runs a 24/7operation and we were able to install while the factory ran at full capacity without disruption.
This was an interesting project. The pre-existing concrete block bunkers were being used to contain processed plastic granules from a recycling process. Each bunker measured 12m wide x 10m deep and there were 4 in the block. Follow an inspection by the Environment Agency, our client was instructed to cover the bunkers or face a hefty fine. After checking that planning permission was not required a design was produced and agreed along with necessary structural calculations. Due to the irregularity in the concrete block work (pre-existing) most of the canopy had to be fabricated on-site. This job was completed within 8 weeks of our first site visit. Our team was on site for 14 days in total and the recycling plant ran as normal during the project.
Call or email to discuss your requirements and arrange a site visit.
COALVILLE. LEICESTERSHIRE
Open today | 09:00 – 17:00 |